Case Studies

Hyperoptic cabinet installation – Glasgow

Sitec worked in partnership with Hyperoptic to site a comms cabinet and associated power meter cabinet on street in Glasgow. The process included MSV and GPR surveys, electrical design, arranging power supply, applying for the planning consent, civils, cabinet installation and handover pack.